Installation of topsoil and fine grading
landscaped areas.
·
Sod Installation
·
Final Walk-through to find areas that need
repair.
Work Anticipated This Week
·
Paving of asphalt surface
·
Making final repairs to items as identified with
final walk-through.
The paving of asphalt surface was pushed back to allow for
sufficient time to get the sod restoration completed. A thin layer of oil will
be placed on the existing asphalt surface prior to the final layer of asphalt
being paved. Sand will also be placed on driveways and the roadway. This will
help from tracking the oil on your concrete or brick driveways as well as help
splattering on your vehicle. We do ask that you drive slowly over the fresh
layer of oil.
Asphalt surface paving is scheduled for Monday, October 26th.
We will ask that you minimize your trips along the roadways and no
parking will be allowed on the streets. Access along the streets will also
likely be restricted due to the paving operations and number of trucks within
the area.
Once the final layer of asphalt is installed, the major
construction operations of the project will be completed with a few minor
repairs and restoration items to be completed.
Thanks again for all your patience during these past several
months you have been living in a construction zone.