Concrete curb & gutter installation
·
Fine grading of roadway
·
Rough grading of landscape areas behind cub
& gutter
·
Paving of first layer of asphalt pavement
·
Asphalt driveway restorations
Work Anticipated This Week
·
Adjust manhole structures within the pavement
·
Topsoil installation
·
Fine grade landscape restorations
·
Sod installation
·
Perform miscellaneous testing prior to final
asphalt surface
Thank you to all the residents along Glenayre Drive that
have been without access to your driveways for almost 2 weeks. Your patience
and understanding has been greatly appreciated. With the first layer of asphalt
pavement being completed, the amount of dust will be greatly reduced, as well
as providing a smooth surface to drive on.
The contractor will continue to perform landscape
restorations and begin performing final project testing for the next few weeks.
Once all inspections and tests have passed, sod installed, and other
miscellaneous tasks completed, the final asphalt surface layer will be
installed along the entire project site including Glenayre Drive, Glenridge
Drive, and Glen Court.
Thank you again to all the residents within the project site
has you have been dealing with the dusty conditions and rough roads for several
months now. Hopefully, you are beginning to see the end of the light and
pleased with the final project.
At this time, residents can begin contacting their
irrigation and brick driveway contractors to begin having those items restored.