Concrete Curb & Gutter and First Layer of Asphalt Completed. Landscape Restoration to Begin

Work Completed Last Week (Glenayre Drive):
·         Concrete curb & gutter installation
·         Fine grading of roadway
·         Rough grading of landscape areas behind cub & gutter
·         Paving of first layer of asphalt pavement
·         Asphalt driveway restorations

Work Anticipated This Week
·         Adjust manhole structures within the pavement
·         Topsoil installation
·         Fine grade landscape restorations
·         Sod installation
·         Perform miscellaneous testing prior to final asphalt surface
 
Thank you to all the residents along Glenayre Drive that have been without access to your driveways for almost 2 weeks. Your patience and understanding has been greatly appreciated. With the first layer of asphalt pavement being completed, the amount of dust will be greatly reduced, as well as providing a smooth surface to drive on.

The contractor will continue to perform landscape restorations and begin performing final project testing for the next few weeks. Once all inspections and tests have passed, sod installed, and other miscellaneous tasks completed, the final asphalt surface layer will be installed along the entire project site including Glenayre Drive, Glenridge Drive, and Glen Court.

Thank you again to all the residents within the project site has you have been dealing with the dusty conditions and rough roads for several months now. Hopefully, you are beginning to see the end of the light and pleased with the final project.

At this time, residents can begin contacting their irrigation and brick driveway contractors to begin having those items restored.

Monday, September 21, 2015


Work Completed Last Week (Glenayre Drive):

·         Install concrete curb and gutter from Glenview Rd. to Westview Rd.

·         Continued excavation of roadway and installation of new aggregate base materials.

·         Installation of curb string line and preparation for curb installation from Westview Rd. to Central Rd.


Work Anticipated This Week (Glenayre Drive)

·         Install concrete curb and gutter from Westview Rd. to Central Rd.

·         Backfill behind new curb and gutter.

·         Prep for asphalt and concrete driveway replacement.

·         Install asphalt and concrete driveway pavement.

·         Pave first two layers of asphalt roadway pavement.

 
The major roadway reconstruction of Glenayre Drive will continue this week as concrete curb & gutter poured, and first two layers of asphalt pavement paved. The current schedule due to a rain delay has concrete curb & gutter pouring to begin the week of September 21st and asphalt pavement installed by end the of the week, depending on work progress and weather conditions. Residents will be notified of driveway restrictions as the scheduled is finalized.

 
Thank you again for all your patience and understanding.

Friday, September 11, 2015


The major roadway reconstruction of Glenayre Drive will continue this week and last for the next 2 weeks as the roadway is excavated, new aggregate base is installed, concrete curb & gutter poured, and first two layers of asphalt pavement paved. The current schedule has concrete curb & gutter layout, preparation, and pouring to begin the week of September 14th and asphalt pavement installed by end the of the week of September 21st, depending on work progress and weather conditions. Residents will be notified of driveway restrictions as the scheduled is finalized. 

 
Work Completed Last Week: (Glenayre Drive)

·         Excavate existing roadway materials and install new aggregate base course.
·         Excavate and re-install new aggregate base materials in areas where the existing materials are poor
·         Remove existing pavement at entrance to neighborhood at Glenview Road and Glenayre Drive

Work Anticipated This Week (Glenayre Drive)

  • Continue excavation of existing roadway materials and installing new aggregate base course.
  • Continue excavation and installing new aggregate base materials.
  • Installation of curb string line and preparation for curb installation on Glenayre Dr.
  • Install concrete curb and gutter on Glenayre Dr. by the end of the week.
The contractor will continue to grade and clean-up Glenridge Drive and Glen Court in preparation for landscape and sod restoration over the next few weeks.

Thank you again for all your patience and understanding.



 
 
 

Monday, September 7, 2015

Glenayre Drive Roadway Reconstruction to Begin This Week

Work Completed Last Week:
·         Completed asphalt driveway restoration along Glen Court & Glenridge Drive
·         Landscape grading along Glen Court & Glenridge Drive
·         Raise manhole frames and grates within the pavement along Glen Court & Glenridge Drive
·         Removed existing driveways and installed temporary access along Glenayre Drive
·         Lowered manhole covers below grade along Glenayre Drive

Work Anticipated This Week (Glenayre Drive)
·         No work on-site on Labor Day
·         Excavate existing roadway materials and install new aggregate base course.
·         Excavate and re-install new aggregate base materials in areas where the existing materials are poor.
·         Remove existing pavement at entrance to neighborhood at Glenview Road and Glenayre Drive.
 
The contractor will continue to grade and clean-up Glenridge Drive and Glen Court in preparation for landscape and sod restoration over the next few weeks.

The major roadway reconstruction of Glenayre Drive will begin this week and last for the next 3 weeks as the roadway is excavated, new aggregate base is installed, concrete curb & gutter poured, and first two layers of asphalt pavement paved. The current schedule has concrete curb & gutter layout, preparation, and pouring to begin the week of September 14th and asphalt pavement installed by end the of the week of September 21st, depending on work progress and weather conditions. Residents will be notified of driveway restrictions as the scheduled is finalized.

Thank you again for all your patience and understanding.